ホーム / Skills / SNSコンテンツ / SNS コンテンツカレンダー(Social Content Calendar)
SNSコンテンツ

SNS コンテンツカレンダー(Social Content Calendar)

AIBarsMITSkill の言語: 英語
ライセンス確認済みスクリプトなし低リスク
デモ実行記録 · claude-sonnet-5-5 · 2026年10月
I run a small ceramics studio in Portland. I sell mugs and bowls online (Etsy and my own site) and teach weekend pottery classes. I'm one person with about 4 hours a week for social media. My goal for October is to fill my pottery classes (8 spots each, on Saturday Oct 10, 17, 24 and 31; currently 3 of 8 booked for Oct 10 and almost nothing for the others) and to grow my email list. I mainly use Instagram and I could add one more platform. I have a good photo library from the last year and I have no idea what to post. Please plan 4 weeks starting Monday Oct 5, 2026.
Skill: social-content-calendar

October plan for your ceramics studio (Mon Oct 5 – Sun Nov 1, 2026)

Today is Wed Oct 7, so Week 1 starts mid-week. The Oct 10 class is only three days away, so that's the most urgent item.

1. Assumptions and open questions

Please correct any of these.

  • Time: You have about 4 hours a week, and you do everything yourself.
  • Audience: Portland-area adults who want a hands-on weekend activity. That includes beginners, date nights, friends' outings and gift-givers. Your mug and bowl buyers online are a second audience.
  • Offer: Each Saturday class has 8 spots, and you have a booking link. I don't know the price, length, what students make, or whether you have a waitlist.
  • Email list: You have a signup form on your site. I'm assuming you have no lead magnet yet.
  • Photos: Your photo library has process shots, finished work and some class photos. I'm assuming you have no student photos with permission to share yet.
  • Success for October: All four Saturdays are as full as you can get them, and the email list grows. I don't know your starting numbers, so write them down on Oct 7 as your baseline.

2. Content pillars

These are a starting mix to adjust after the review, not a rule.

Pillar Purpose Angles Share
Make it (process) Teach / entertain Clay-to-mug reels, trimming and glazing close-ups, kiln-opening reveals ~35%
Try it (classes) Invite / prove What happens in a class, what to wear, student pieces (with permission), seats left ~30%
Know it (tips) Teach Mug care, how to choose a mug, wheel vs. hand-building, FAQs ~20%
Meet the studio Connect Your story, Q&A, studio mornings, Portland touches ~15%

3. Platform roles and rhythm

  • Instagram (main job: fill classes):
    • 3 feed posts a week, mostly Reels and carousels.
    • Stories on class days and in the 2–3 days before each class.
    • 10 minutes a day replying to comments and DMs.
  • Email (main job: grow and convert the list): 1 short email a week, plus a lead magnet.
    • Suggested lead magnet: "First-timer's guide to a pottery class". It's a one-page PDF covering what to expect, what to wear and FAQs.
    • Put it on a signup page and in your bio link.
    • Optionally offer early access to restocks or the next class dates.
  • Optional second platform: Facebook.
    • Use it only for local reach: create an event for each class and share it in Portland community groups where posting is allowed.
    • Reuse your Instagram posts. Don't create anything new.
    • Check the current features and group rules yourself.
    • If it feels like too much, skip it this month. Email is your second channel.

4. Calendar

Roughly 75% of slots are planned. The "OPEN" rows are for reactive posts.

Week 1 (Oct 7–11): fill Oct 10 and set up the list

Date Platform Pillar Format Topic and hook CTA Asset Status
Wed Oct 7 IG Stories + Feed Try it Photo + Stories "5 seats left this Saturday. Here's what you'll make." Book link Library class photo
Wed Oct 7 Facebook Try it Event + local groups Same as above Book link Reuse
Thu Oct 8 IG Try it Carousel "What actually happens in a pottery class" (arrive, wedge, throw, glaze, pick up) Book Oct 10 or 17 5–6 library photos
Thu Oct 8 Email Try it Email #1 Short note to your current list: 5 seats Saturday, plus the Oct 17, 24 and 31 dates Book Text only
Fri Oct 9 IG Stories Meet Stories Prepping the studio, last call Book (if seats remain) Phone
Sat Oct 10 IG Stories Try it Stories Class in action. Ask students if you can share their pieces. None Phone
Sun Oct 11 IG Make it Reel Reuse a library clip: "from lump of clay to mug in 30 seconds" Save for later Library video
This week Website n/a Setup Create the lead magnet PDF and signup page, then put the link in your bio n/a Canva or similar

Week 2 (Oct 12–18): fill Oct 17 and Oct 24

Date Platform Pillar Format Topic and hook CTA Asset Status
Mon Oct 12 IG Know it Carousel "Wheel or hand-building? What's best for your first class" Comment your pick Library photos
Wed Oct 14 IG Try it Photo or Reel Student pieces from Oct 10 (with permission). Use a real quote only if a student gave you one. Book Oct 24 Class photos
Wed Oct 14 Email Know it Email #2 Lead magnet announcement: "First-timer's guide" Download, then book PDF
Fri Oct 16 IG Stories Try it Stories Last call for Saturday Book Phone
Sat Oct 17 IG Stories Try it Stories Class day None Phone
Sun Oct 18 IG Meet Photo Your story: why you started teaching Reply with your first pottery memory Library portrait
OPEN IG Any Any Reactive slot n/a n/a

Week 3 (Oct 19–25): fill Oct 24 and Oct 31

Date Platform Pillar Format Topic and hook CTA Asset Status
Mon Oct 19 IG Make it Reel Kiln-opening reveal from the library: "the moment you find out" Follow for more Library video
Wed Oct 21 IG Meet Stories (Q&A box) "Ask a potter anything." Save the questions for the idea bank. Ask a question Phone
Wed Oct 21 Email Try it Email #3 Halloween-weekend class (Oct 31), plus 2–3 answers from the Q&A Book Oct 24 or 31 Text and photo
Fri Oct 23 IG Try it Photo "Last seats for tomorrow, plus Halloween Saturday" Book Library photo
Sat Oct 24 IG Stories Try it Stories Class day None Phone
Sun Oct 25 IG Know it Carousel "How to care for a handmade mug" (dishwasher, microwave and so on, based on your own glazes) Save and share Library photos
OPEN IG Any Any Reactive slot n/a n/a

Week 4 (Oct 26–Nov 1): fill Oct 31 and plan beyond

Date Platform Pillar Format Topic and hook CTA Asset Status
Mon Oct 26 IG Make it Reel Glazing close-up: "why the color changes in the kiln" Follow Library video
Wed Oct 28 IG + Facebook Try it Carousel or Reel "Halloween Saturday: make a mug you'll use all winter" (adjust to your own theme) Book Oct 31 Library photos
Wed Oct 28 Email Try it Email #4 Final call for Oct 31, plus a note about November classes or holiday orders Book / Reply Text
Fri Oct 30 IG Stories Try it Stories Last call Book Phone
Sat Oct 31 IG Stories Try it Stories Class day None Phone
Sun Nov 1 IG Meet Photo "Thank you, October." Announce the next class dates if you have them. Join the email list Class photo
OPEN IG Any Any Reactive slot n/a n/a

5. Batching and reuse

Spend about 4 hours a week like this:

  • Sunday, about 1.5 hours: Pick photos and clips from your library, write captions and hooks for the week, and schedule posts.
  • Class days, 15 minutes each: Take a few phone clips and photos. These feed the following week's posts.
  • Daily, 10 minutes: Reply to comments and DMs.
  • Weekly, about 30 minutes: Write the email. Reuse the Instagram caption and add one personal line.
  • Remaining time: Buffer, and the lead magnet in Week 1.

Reuse plan:

  • One class-day clip can become a Story, a Reel and an email photo.
  • The "what happens in a class" carousel can be reused for Facebook and as a pinned post.
  • Keep a running idea bank of questions from DMs, Q&A answers and customer emails.

6. Review plan

Review date: Mon Nov 2 (about 20 minutes).

  • Metrics that match your goals:
    • Seats booked per class, and where each booker said they came from. Ask at checkout or when they arrive.
    • New email subscribers.
    • Link clicks from Instagram.
    • Which posts got saves, shares or DMs, not just likes.
  • Questions: Which pillar and format led to bookings? What should you stop? What should you keep?
  • Two experiments for November (change one thing each):
    1. Post more process Reels, or more class-focused posts, depending on which drove bookings.
    2. Try an incentive for the list, such as early access to class dates.

One thing to do today: Post the "5 seats left Saturday" Story and send the short email to your existing list. That's the fastest way to fill Oct 10.

Platform features, group rules and the setup of your booking and email tools change, so check them yourself. Only share student photos and quotes you have permission to use.

Fictional scenario written by the reviewer (a one-person ceramics studio). I checked the dates in the calendar against the real calendar: Oct 5, 2026 is a Monday and Oct 10, 17, 24 and 31 are Saturdays. The model listed a few assumptions the brief did not give (a booking link, a signup form); they appear as assumptions in the answer and the user would need to confirm them. Nothing was posted.

できること

目標、読者、限られた時間を、実際に続けられるカレンダーに変えます。目標、誘導したい商品やイベント、使うプラットフォーム、使える時間、大事な日付を聞いたうえで、役割のはっきりした 3〜5 個のコンテンツの柱を選び、各プラットフォームに役割と無理のないペースを割り当て、日付入りの投稿表(プラットフォーム、柱、形式、テーマとフック、行動の呼びかけ、素材、状況)を作ります。話題に対応するための空き枠も残します。さらに、まとめて作って使い回す方法と、約 4 週間後の短い振り返り(目標に合った指標と、次に試す 2 つの実験)も示します。「最適な投稿時間」やアルゴリズムが好むものを断定することはなく、前提はすべて明示します。

出力

前提と確認事項、コンテンツの柱、プラットフォームごとの役割とペース、カレンダー表、まとめ作りの計画、振り返りの計画。

こんな場面に

ネタや時間が足りず、そのまま実行できる計画がほしい小規模事業者、クリエイター、小さなチーム。

補足とリスク

低リスク:指示のみのファイルで、スクリプトはなく、ネットワークにも接続せず、ファイルも書き込みません。作るのは計画で、投稿やアカウント連携は行いません。実際の数値や各プラットフォームの現在の仕組みは分からないため、ご自身の分析データとプラットフォームの最新ルールを確認してください。架空の陶芸工房の依頼で一度試用し、日付は実際のカレンダーと照合しましたが、実際のプラットフォームには何も投稿していません。広告・提携投稿の表示と、実在の声だけを使うことも促します。AIBars 制作(MIT)。